Accelerate Interconnection
Interconnection delays cost millions. VoltryOS delivers IEEE 1547-compliant monitoring, automated power quality validation, and battery health analytics to get DER projects online 40% faster.
40%
Faster Permits
1547
IEEE Compliant
91%
Uptime Achieved
DER & Microgrid Challenges
Interconnection delays and compliance complexity slow project deployment
Interconnection Delays
Utilities require months of power quality data before approving DER interconnection permits.
Solar + Storage Complexity
Coordinating inverters, batteries, and grid connection without real-time optimization wastes energy.
Battery Degradation
Without health monitoring, batteries fail prematurely, destroying project economics.
VoltryOS for DER & Microgrids
Get projects online faster with automated compliance and optimization
IEEE 1547 Compliance
Automated power quality monitoring with voltage, frequency, and anti-islanding data. Generate utility-ready reports instantly.
40% faster permit approval
Solar Inverter Optimization
Real-time MPPT tracking, string-level monitoring, and predictive maintenance to maximize energy harvest.
15% energy yield increase
Battery Health Analytics
State of charge, state of health, and cycle life tracking with AI-driven degradation prediction.
2x longer battery life
Power Quality Validation
Continuous THD, flicker, and voltage regulation monitoring ensures grid code compliance 24/7.
Zero compliance violations
Technical Features
Purpose-built for distributed energy resources
IEEE 1547 Monitoring
Automated compliance testing for voltage, frequency, and anti-islanding
MPPT Optimization
String-level monitoring with ML-driven maximum power point tracking
Battery Analytics
SOC, SOH, cycle counting, and degradation prediction
Power Quality
Real-time THD, flicker, and voltage regulation monitoring
Predictive Alerts
Early warnings for inverter faults, battery issues, and grid events
Energy Optimization
AI-driven charge/discharge scheduling for maximum ROI
Permits 40% Faster
Real results from DER deployments
40%
Faster Permits
15%
Energy Yield Increase
2x
Battery Life Extension
100%
IEEE 1547 Compliant
"VoltryOS cut our interconnection timeline from 9 months to 5.5 months. The automated IEEE 1547 reporting gave the utility everything they needed upfront. Battery health monitoring has extended our expected ROI by 3+ years. Worth every penny."
VP of Engineering
Solar + Storage Developer, 50MW Portfolio
Case Study: 5MW Solar + 10MWh Storage
How VoltryOS helped a commercial microgrid achieve interconnection 4 months early and increase energy yield by 18%.
- Interconnection approved in 5.5 months vs 9+ month average
- Battery life extended from 8 to 15+ years projected
- Zero grid code violations in 2+ years of operation
- 18% energy yield increase through MPPT optimization
Case Study Diagram
Ready to Accelerate Interconnection?
Join DER developers using VoltryOS to get projects online faster and maximize ROI.