Accelerate Interconnection

Interconnection delays cost millions. VoltryOS delivers IEEE 1547-compliant monitoring, automated power quality validation, and battery health analytics to get DER projects online 40% faster.

40%

Faster Permits

1547

IEEE Compliant

91%

Uptime Achieved

DER & Microgrid Challenges

Interconnection delays and compliance complexity slow project deployment

Interconnection Delays

Utilities require months of power quality data before approving DER interconnection permits.

Solar + Storage Complexity

Coordinating inverters, batteries, and grid connection without real-time optimization wastes energy.

Battery Degradation

Without health monitoring, batteries fail prematurely, destroying project economics.

VoltryOS for DER & Microgrids

Get projects online faster with automated compliance and optimization

IEEE 1547 Compliance

Automated power quality monitoring with voltage, frequency, and anti-islanding data. Generate utility-ready reports instantly.

40% faster permit approval

Solar Inverter Optimization

Real-time MPPT tracking, string-level monitoring, and predictive maintenance to maximize energy harvest.

15% energy yield increase

Battery Health Analytics

State of charge, state of health, and cycle life tracking with AI-driven degradation prediction.

2x longer battery life

Power Quality Validation

Continuous THD, flicker, and voltage regulation monitoring ensures grid code compliance 24/7.

Zero compliance violations

InverterBatteryGridONLINESolar: 45kWBattery: 80%Grid: ExportPQ: 1547✓DER SystemIEEE 1547 Compliant | Optimal Performance

Technical Features

Purpose-built for distributed energy resources

IEEE 1547 Monitoring

Automated compliance testing for voltage, frequency, and anti-islanding

☀️

MPPT Optimization

String-level monitoring with ML-driven maximum power point tracking

🔋

Battery Analytics

SOC, SOH, cycle counting, and degradation prediction

📊

Power Quality

Real-time THD, flicker, and voltage regulation monitoring

🔔

Predictive Alerts

Early warnings for inverter faults, battery issues, and grid events

📈

Energy Optimization

AI-driven charge/discharge scheduling for maximum ROI

Permits 40% Faster

Real results from DER deployments

40%

Faster Permits

15%

Energy Yield Increase

2x

Battery Life Extension

100%

IEEE 1547 Compliant

DR

"VoltryOS cut our interconnection timeline from 9 months to 5.5 months. The automated IEEE 1547 reporting gave the utility everything they needed upfront. Battery health monitoring has extended our expected ROI by 3+ years. Worth every penny."

VP of Engineering

Solar + Storage Developer, 50MW Portfolio

Case Study: 5MW Solar + 10MWh Storage

How VoltryOS helped a commercial microgrid achieve interconnection 4 months early and increase energy yield by 18%.

  • Interconnection approved in 5.5 months vs 9+ month average
  • Battery life extended from 8 to 15+ years projected
  • Zero grid code violations in 2+ years of operation
  • 18% energy yield increase through MPPT optimization

Case Study Diagram

Ready to Accelerate Interconnection?

Join DER developers using VoltryOS to get projects online faster and maximize ROI.